Bizator  /  Adverts  /  equipment and materials  /  industrial equipment  /  mining and quarry equipment

The device assignments and monitoring the progress of the winder ACP-1

Offer type: salePublished: 14.01.2016
Price:negotiated
Company:Biglebedki
Seller:Martyinenko Aleksandr
Phones:
Show phone
Write a message
Address:Ukraine, Kharkivs'ka Oblast', Kharkiv

Designed:

• issue pulses at certain points the path of motion of the lifting vessel to carry out the necessary switching in the automatic control circuit;

• convert the angular displacement lifting machine for measuring the electrical pointers of depth-of-way, traveled with a lifting vessel;

• to adjust the items apparatus in accordance with the position of lifting vessels in the shaft;

• provide protection against overwind, monitoring the integrity of the kinematic chain transmitting rotation from lifting cars to blocks selsyn sensors;

• monitoring actual speed in the period of acceleration, uniform speed and deceleration.

Made technical conditions TU 12.47.188-74.