Bizator  /  Adverts  /  construction industry  /  building technology and spare parts

Self-propelled hydraulic pile driving installation with brown for rock Gayk HRE-3000

Offer type: salePublished: 11.02.2013
Seller:Chigrina Natal'ya
Phones:
Show phone
Write a message
Self-propelled hydraulic pile driving installation with brown for rock Gayk HRE-3000
chassis with rubber tracks Terex width of 300 mm and a negative brake;
- 3-cylinder diesel engine HATZ 3L41C with air-oil cooled, 34,4 kW;
- hydraulic hammer PB 310, weight 450 kg, 650-1450 blow/min, 1 050 joules;
- regular set auger with hydraulic motor:
- drilling crown 100-190mm (selected by customer)
- automatic alignment of the mast;
system controls the distance between the score stands;
- the default generator for connection of power tools power 3.5 kw;
- noise level: 50 dBA at 3000 rpm
- manage the positioning and movement of the machine and mast 9 levers proportional to the modular dispenser Bucher;
- hydrostatic system c pump with a capacity of 90 l/min at a pressure of 190 bar;
- oil heat exchanger 180 HP;
- the diesel tank at 60 HP;
- the angle of the mast and down to +/- 18°;
vertical freedom of movement of the mast up to +/- 300 mm, fully lowered to the ground;
- horizontal removal of the mast from the edge of the chassis - up to 1 900 mm;
- the length of the mast - 3 500 mm (can be extended by agreement);
- riversiana guide bars mounted on the mast;
- automatic stop of the hammer at a fixed height of the mast;
- Max. dimensions of the column - 160 x 140 mm, Max. height of the column - 3 000 mm;
- hydromassage for drilling and other additional equipment;
- electrical system 12 Volt;
2 lamp;
- dimensions striker at the request of the client;
- gas tank with nitrogen, lubricating fluids and syringes;
transport dimensions LxWxH: 2 280 mm x 2 180 mm x 2 400 mm;
- weight - 3 900 kg