Bizator  /  Adverts  /  equipment and materials  /  industrial equipment  /  heating engineering, boilers

Boilers pyrolysis КFP

Offer type: salePublished: 05.03.2015
Price:negotiated
Seller:Konstantin
Phones:
Show phone
Write a message
Address:Ukraine, Poltavs'ka Oblast', Kremenchuk

Boilers KFP can be used for heating of a country a house (cottage), and when the heating plant areas, enterprises, huge storage areas, kindergartens, school buildings, service stations, greenhouses, drying chambers, Church temples etc.
The principle of operation of heating boilers built in the pyrolysis reaction, the essence of which is that in conditions of high temperatures and insufficient revenues oxygen fuel is decomposed wood (generator) gas and solid waste. This allows you to achieve the most efficient combustion and get maximum of thermal energy per unit of fuel.
The advantages of solid fuel pyrolysis boilers:
- Efficiency up to 85%;
- easy maintenance and cleaning;
large fuel container;
- low fuel consumption (economy);
- ability to adjust the power of a heating boiler for solid fuel;
- the use of solid fuel boiler as a backup;
- complete burning of fuel;
- switch on the boiler continues to operate at reduced power and without fan;
- the optimal ratio of price and consumer properties;
- environmentally friendly and thrift in relation to the environment;
- fast return on investment.
The pyrolized boilers operate on vegetable fuel, firewood, twigs, leaves, briquettes, you can burn almost any debris.
The boilers we produce metal thickness 4mm, all internal surfaces are in direct contact with water, which doesn't allow the walls to overheat and fail. The bottom of the furnace and combustion chamber lined with refractory fireclay, which increases the service life of the boiler.

Boilers pyrolysis КFP-25
1. Thermal power, kW ±10% - 25
2. Efficiency, %, not less - 81-92
3.Fuel bunker Dm3 - 82
4. Working pressure, bar - no more than 2
5. Minimum return water temperature 0 C, not more than 65
6. The size of the pipe outlet of the combustion products, mm - 170/170
7. The duration of the operating cycle, hour, not less
(at a moisture content of wood not more than 20%) 12* (wood)
8. Capacity, l - 85
9. Overall dimensions, mm, not more
- Length - 550
- Width - 540
- Height - 1280
10. Weight, kg, not more than 280
11. Warranty, 2 years

Boilers pyrolysis КFP-35
1. Thermal power, kW ±10% - 35
2. Efficiency, %, not less - 81-92
3.Fuel bunker Dm3 - 130
4. Working pressure, bar - no more than 2
5. Minimum return water temperature 0 C, not more than 65
6. The size of the pipe outlet of the combustion products, mm - 170/170
7. The duration of the operating cycle, hour, not less
(at a moisture content of wood not more than 20%) 12* (wood)
8. Capacity, l - 110
9. Overall dimensions, mm, not more
- Length - 650
- Width - 600
- Height - 1280
10. Weight, kg, not more than 350
11. Warranty, 2 years

Boilers pyrolysis КFP-50
1. Thermal power, kW ±10% - 50
2. Efficiency, %, not less - 81-92
3.Fuel bunker Dm3 - 190
4. Working pressure, bar - no more than 2
5. Minimum return water temperature 0 C, not more than 65
6. The size of the pipe outlet of the combustion products, mm - 170/170
7. The duration of the operating cycle, hour, not less
(at a moisture content of wood not more than 20%) 12* (wood)
8. Capacity, l - 155
9. Overall dimensions, mm, not more
- Length - 800
- Width - 700
- Height - 1280
10. Weight, kg, not more than 425
11. Warranty, 2 years