2007. Good condition.

Specifications:

Mobile concrete plant Hartmann HA MP 1500/1000 SM (Germany)
Located on the semi-trailer.

Manufacturer: Hartmann (Germany)
Type: HAMP 1500/1250
Year of release: 2007
Time: 1,574 Moto/hour

Planetary mixer
Performance: approx. 40-55 CBM/h
The volume mixer:
1,500 l – download
1,250 liters – unloading of the finished concrete
Mixer capacity: 45 kW
2 rotating mixing arm with 2 scrapers
Cladding steel tile
Unloading electro / hydraulic opening of the valve
On triaxial semi-trailer
Autonomous Generator 125 kVA diesel IVECO
Unloading conveyor belt, width 1000 mm, length 11 m
Cement auger, length 5 m, diameter 200 mm

The plant is fully verified.

Performed the following maintenance:
• Full disassembly
• Cleaning all the individual parts
• New the bottom of the car from 30 mm metal plates
• 4 new DLCs
• 2 new chassis Jöst
• Straightening and repair of
• New inner lining mixer
• The condition of the conveyor belt by about 90%
• Build, test run
• Fully new painting
Included a Diesel generator, a feed conveyor of concrete, cement auger, as described above.

In very good condition, located in Germany, you can see.

We can produce a trial run and testing of the plant. The test factory need 1-2 days.

Description and operation of the mobile mixing plant of Hartmann HA MP 1500/1000 SM:
The system consists of different components depending on customer requirements! In the usual case
Usually it consists of a new semitrailer two double bins, one
Planetary mixer, controller, PLC, with weighing device, cement screw,
Unloading the tape, the system water pressure, water tank, chemical tanks and Generator. All components are firmly attached to the trailer. Only the Discharge conveyor are mounted on the platform for transportation.

Arriving at the construction site, the plant is disconnected from the tractor and put on
support the relevant support. The whole system is placed horizontally. Transport locks for the discharge conveyor and cement screw that
are screwed or fastened by bolts, loosened and with the help of wheel loader are installed in the appropriate position. After that, transport the lock will unlock the mixer and the mixer hydraulically drained into the weighing system (the Mixer now functions as a scale for weighing). After checking the tanks for storage (water, diesel fuel for
Generator) and management of the silos and the mixer (any items), runs the generator.

The silos are filled by wheeled loader, which is important in bunker # 1
always sand as we first mix the sand, water and cement to reduce the time of mixing.
In the controller PLC of various concrete recipes are passed via the touch panel (save up to 100 recipes). Likewise, here are various options - Management, such as mixing all components, a break to restart, accuracy, weight, waiting time between components, as well as a balance between the systems. Installed water meter. Select the desired recipe and then when the mixer is started, the dosage system automatically starts by pressing the start button.

To get an accurate result of weighing at the plant, the built-in correction of the overflow. In the beginning of the first mixture may be the difference in weight (the material that is still falling from the belt) the Control automatically detects the error and automatically adjusted to achieve the desired weight.
After the completion of the previously applied mixing time opening the mixer valve (manually or automatically), and the finished concrete with the unloading of the tape serves automixer or transportation in any other way.
The system has a USB drive from which data is copied day-to-excel file and thus, each party with a batch Number, date, time and weight will be documented.