B/Fast-asphalt plant Benninghoven ECO - 320 t/h, 2013
Company: | SUMAB Ukraina |
Seller: | Artem |
Phones: | +380507383348 Show phone |
Address: | Ukraine |
B/Fast (container) asphalt plant Benninghoven ECO 4000 - 320 t/h, 2013
The highest mobility along with optimum flexibility distinguish the plants of this type which can be operated stationary, but it is also easily transported to other construction sites. The main difference between asphalt plants type of ECO is the performance of their main components, which correspond to the dimensions of a standard (20 or 40 - foot) shipping container, which ensures their easy transport by truck, by sea or by rail.
Production parameters:
Model ABS ECO 4000
The mixing performance (t/h) 320
Drying capacity (t/h) 290
General information All data refer to the material humidity of 4 %
Wind load: 25 m/s; horizontal ground acceleration: 0.4 m/S2; snow load: 0,85 kN/m2.
The methods of installation of Stationary = solid concrete Foundation; with the option of moving mobile steel base
The pre-dosing
Number of dispensers 5-tier module pre-dosing
Capacity (m3) 12
The loading ramp is Provided to the operating side
Width of loading (mm) 3500
Tumble dryer Type TT 11.26
The drive power of drum (kW) 4 x 22
Burner Type EVO JET FU 4 fluid. fuel
Burner power (MW) 24
Dust extraction
Capacity (Nm3/h) 78 000
The roar/bunker hot minerals
Performance screening (0-2 mm, t/h) 270
Round 5-tiered
Bunker hot minerals 17 t/ 5 cameras (including sand + bypass)
Mixing and weighing section
Mixer (kg) 4000
Scales for mineral rocks (along with MB, kg) 4000
Scale fillers (along with MB, kg) 400
Scales for bitumen (along with MB, kg) 350
Hopper ready mix/silos for fillers
The total capacity of the hopper drive ready mix MGVS 60 t
(2 cameras + sector direct download)
The silo fillers Silo of 60 m3 for own placeholder, a 60 m3 silo for imported filler.
Bitumen system Performance of a vertical, electrically heated and insulated 200 mm
Capacity (m3) 3 x 60
The computer control system Benninghoven BLS 4000:
switching and power unit, air conditioning and low-voltage main distribution Board
The air asphaltgranulate
Via the middle ring of the drum – Loading 25% of asphaltgranulate
The plant is in excellent working condition.
The vendor has provided assistance in organizing the supervision and other technical issues related to maintenance of the plant.