Scope
  • The production of low and medium power, including the food industry.
Description
  • High efficiency, through the full and effective use of heated surface.
  • Easy maintenance due to easy access to Zharov.
  • Comes with all necessary accessories to start immediately after the connection of water, fuel, electricity.
  • The boiler can be installed as a two-stage and modulating burners with modules power from 30 to 100%.
Case
  • Pressure vessel tested to international standards. The tank and the firebox is made of steel and are welded with special technology arc welding in a gaseous environment.
  • Pressure tank made with the fittings under the water level indicator, feed water, steam, flushing-purging, etc.
  • A flame tube is made of steel tested at the temperature of the walls up to 450°C and are welded to the head Board.
  • Rear smoke chamber made of heat-resistant structural steel, has the connection for the chimney.
  • Front smoke chamber is made of heat-resistant structural steel. Insulation refractory concrete. With the door opening to control heat pipes and a flange for burner.
  • Insulation of high density mineral wool of 100 mm thickness and density 100 kg/m3, covered with metal sheets.
  • Steel base frame to support the boiler and accessories.
Valves
  • The steam release valve PN 16.
  • The team with valve and tap PN 16.
  • Valves for water level indicator (2 pieces).
  • The ball valve.
The adjustment devices and control
  • Indicator-reflector level.
  • The pressure differential switch adjust steam pressure.
  • The pressure differential switch is a maximum steam pressure.
  • The steam pressure gauge with three-way valve and test flange.
  • Electronic automatic level regulator (3 probes).
  • Eye of flame control.
Safety devices
  • Product safety pressure.
  • Gauges level.
  • The pressure relief valve.
  • Probe security at the low level of water.
Control panel
  • A main switch.
  • Switch the burner.
  • The pump switch.
  • Contactor, the charging pump.
  • Automatic level control system.
  • An indicator lamp.
  • Relays, fuses.
  • Junction box.
  • Transformer 220/24V for optional connections.
  • Release button
The parameters
  • Electric power supply: voltage 230V, frequency 50Hz.
  • Power: 115 kW to 2093 kW.
  • Pressure: up to 1.0 bar.
  • Efficiency: 88%.