Bizator  /  Adverts  /  construction industry  /  building and assembly jobs

Measurement loop phase-neutral, phase-zero in Volgograd and Volzhsky

Offer type: servicesPublished: 05.04.2013
Seller:Safonov Denis
Phones:
Show phone
Write a message
Address:Russian Federation, Volgogradskaya Oblast', Volzhskiy
The purpose of the measurement loop resistance phase-zero is to determine compliance with the rated current of the protection devices and the wire size of the measured circuit.
In electrical installations up to 1000 V with earthed neutral safety maintenance of electrical equipment at the break of the housing is provided off the damaged area with a minimum of time. When the circuit phase conductors on connected with the neutral of the transformer (or generator) ground wire or chassis of the equipment is formed by a circuit consisting of a chain of phase and neutral conductor.
Electrotechnical laboratory VPP "NWAM produces measurement loop zero-phase, phase-neutral, for this work have permission of Rostekhnadzor. When the work is issued technical report. Works are carried out on the territory of Volgograd, Volgograd region, Russia.