The number of generated blocks, PCs - 2
The performance of cinder blocks/hour to 60 (almost up to 300 units per shift with one operator, two operators up to 500 units per 8-hour shift).
Mains voltage - 220
Power drive, W - 300
The speed of rotation of the vibrator rpm - 3000
Length, mm - 700
Width, mm - 600
Height, mm - 1300
Weight, kg - 45
Cost - 17000 R.
body Assembly (matrix);
mechanized rise of a matrix;
the pressure on the clamp;
special switches (and the elements of engine starting);
the shock absorbers;
the vibrator.
The duty cycle of the mechanism is as follows:
the batch in the mixer hard concrete (water / cement ratio of 0.5), the maximum cone without impurities (organic, clay, and others);
loading machine;
preliminary vibration of 0.5-1.5 seconds to fill the voids;
the stacked alignment of the mixture in the MARS trowel to the desired level, and if you are used Stikovica the mixture into the corners of forms;
the formation of the block when the vibrator within 20 to 60 seconds, depending on concrete quality, this is achieved experimentally in the process;
the vibrator is turned off when lifting the machine;
unit ready " ...next!
The finished blocks can be transported through the day.
To enable the machine to the network 220 with a grounded wire or through a special Transformer Security.
Time machine is running short (up to 2 minutes continuously).
The motor of the vibrator should not overheat.
Water (moisture) and the solution should not get on the on/off switch on the motor housing and the current-carrying wire.
After the operation, the machine must be cleaned, and wipe clean oil cloth surfaces.
The machine can operate trouble-free for a long time in the operating rules.
The engine does not start:
the failure of the switch/circuit breaker - replace it (when disconnected from the network machine).
to check the integrity of the current-carrying wires and connections (when disconnected from the network machine).
Subject to the terms of use, warranty is made within 1 month from the date of sale (date and signature must be affixed in this guide).
For repair or replacement during the warranty period, the machine Assembly is transferred to the place of sale.
Repair or replacement of the engine are carried out within 7 days from the return date of the machine.
After repairs, the warranty is extended to the specified term of the relevant entry in the manual of the machine.
We use slag approximately the following composition:
10% fraction of 15-20 mm
70% fraction of 1-3 mm
5% fraction of 3-15 mm
other smaller and 2-3% of cement (in the career of slag)
On one bucket of cement M400 (10kg) added a 10l bucket of water and 7 buckets of slag, mixed in the mixer and get 4 units 390-188-190 with three circular cavities. Total with one bag of cement 50kg out of 25 blocks. The proportion of 1 to 7 cement and slag valid on standard machine MS standard because:
The hole-forming cores round and small (76-72 mm cone)
Used slag, with 3% cement
Perhaps on a different raw materials and other hole-forming cores will be different proportions.