Head
connecting
GP-65...150
Discharge head (VAR.2 - hose)
GS-65...150
(GROOVE-5, SLEEP 5 M)
Installation of bottom loading / unloading railway tanks
STS-100
USN-150
USN-150 (OCS)
USN-150/5
USN-175
USN-175/5
USN-200/5 (4 m)
USN-175G
STS-200 (6 m)
USN-200/5 (6 m)
We still follow: the foam medium expansion foam fixed GPS-600, GPS-2000, the state program,
measuring equipment the measuring tanks of the first and second discharge capacity of 10, 20 and 50 cubic DM, metrostate MSP-3.5 A, MSP-4.5 A, roulette with lot of 10 and 20 m,
hatches measuring LZ-50, 80, 150 and lighting LS-500, 800, manholes LL-500, 500У, 600, 600У, 600х900, 800;
firing fuses BY-50, 100, 200, 250, 300, 350, 500 and POU (corner) 50, 80,
the valve receiving CP-40, 50, 80, 100, respiratory SMDK-50, 100, KNDM-100, 150, 200, 250, 350, safety
Website: http://contragent.com.ua/produktsiya/neftegaz/item/golovka-slivnaya-gs-65-gs-75-gs-100-gs-150
Sales Company Contractor: T. 057-780-96-49, f.057-707-84-38, (098) 842-82-06. Ukraine. Kharkov.
e-mail: info@contragent.com.ua