The diaphragm chamber DKS-0,6-50
The diaphragm chamber DQS-10-50
The diaphragm chamber DKS-0,6-65
The diaphragm chamber DKS-10-65
The diaphragm chamber DKS-0,6-80
The diaphragm chamber DKS-10-80
The diaphragm chamber DKS-0,6-100
The diaphragm chamber DQS-10-100
The diaphragm chamber DKS-10-125
The diaphragm chamber DKS-0,6-150
The diaphragm chamber DKS-10-150
The diaphragm chamber DKS-0,6-200
The diaphragm chamber DKS-10-200
The diaphragm chamber DKS-0,6-250
The diaphragm chamber DKS-10-250
The diaphragm chamber DKS-0,6-300
The diaphragm chamber DKS-10-300
The diaphragm chamber DKS-0,6-350
The diaphragm chamber DKS-10-350
The diaphragm chamber DKS-0,6-400
The diaphragm chamber DKS-10-400
Tubeless DBS-500, DBS-600, DBS-800, DBS-1000, DBS-1200, DBS-1400, DBS-1600
Diaphragms are designed to measure the flow of liquids, gases, steam by the method of variable pressure drop using the standard narrowing devices . The diaphragm used in conjunction with transducers differential pressure or differential pressure gauges.
The principle of operation is as follows: in the pipeline diaphragm, creating local constriction of flow. Due to the transition of part of the potential energy into kinetic energy, the average flow velocity in the constricted cross-section becomes less than the static pressure before the constricting device. The difference between these pressures is the greater, the greater the flow rate of the flowing substance.
Production from 2 weeks to 1 month. The cost to ask the Manager.