Bizator  /  Adverts  /  construction industry  /  building and assembly jobs

Installation and commissioning of instrumentation and

Offer type: servicesPublished: 17.06.2013
Seller:kompaniya Igor' Ivanovich Uman'
Phones:
Show phone
Show phone
Write a message
Address:Republic of Belarus, Minsk
Installation and commissioning of instrumentation and in Belarus and the Russian Federation (Moscow and Moscow region).
Production of equipment includes three stages:
1. Study and documentation of the project, on which there will be adjustment. Pre-installation inspection of all devices and systems control.
2. Check the completed installation. The test Adjusters technological equipment.
3. Adjustment and setting of automatic systems. Preparation and design and as-built documentation
These are three basic stages in conducting adjustment of technological equipment.
Currently, the list done by the company "Uman" commissioning includes:
- commissioning of electrical equipment
- installation and commissioning of instrumentation and control systems
- commissioning of individual and Central heat points
Prices commissioning set according to the Legislation of the Republic of Belarus. Extra contractual rates.
COMMISSIONING OF ELECTRICAL EQUIPMENT
Commissioning is a complex work, including inspection, adjustment, and testing of electrical equipment in order to ensure electrical parameters and modes established by the project.
When commissioning, verify that the installed equipment of various types and purposes, and completed installation of the project, identify and resolve faults in electrical circuits, electrical equipment and automation, configure and regulate the devices and drive, check the condition of the insulation and grounding devices, the parameters of electronic devices, experiencing the work of energized electrical equipment in various modes and carry out other work depending on the complexity and type. High quality and properly filled up and adjustment works are the key to reliable and trouble-free operation of all parts of a single system, to further promote the efficient and uninterrupted operation.
INSTALLATION AND COMMISSIONING OF INSTRUMENTATION AND AUTOMATIC CONTROL SYSTEMS
Commissioning work on automation systems, according to SNiP, carried out in three stages:
In the first stage, preparatory work, and examined the detailed documentation of the automation systems, the main characteristics of the instruments and means of automation. The system checks the devices and means of automation with the necessary adjustment of individual items of equipment.
When testing the devices and means of automation verify the conformity of the basic technical characteristics of the equipment to the requirements set forth in passports and instructions of the manufacturers. The results of the inspection and adjustment recorded in the act or the certificate of the equipment. Faulty devices and means of automation is transmitted to the customer for repair or replacement.
Devices and means of automation, cannibalized, without technical documentation (passports, certificates, etc.,), with changes not reflected in the technical conditions for inspection shall not be accepted. Upon completion of the scanning devices and means of automation are passed in the Assembly by the act.
In the second stage, the work on Autonomous adjustment of automation systems after their installation.
When this is done:
check installation of automation equipment and systems for compliance with instructions of the manufacturers of the devices and means of automation and documentation; defective installation of automation equipment and systems are eliminated and installation organization
check the accuracy of labeling, connection and phasing electrical installations
the phasing and control characteristics of the actuators
configure the logical and temporal relationships alarm systems, protection, blocking and control; validation signal
preparation for the inclusion and involvement of automation systems to provide individual testing of process equipment and adjustment of the settings of the hardware systems in the course of their work
design and production of technical documentation.
Necessary to disconnect or switch pipe and electrical installations associated with the verification or adjustment of individual devices or automation, providing commissioning organization.
The inclusion of automation systems in the work should be performed only if:
no violations of the requirements of the operating conditions of the devices and means of automation, communication channels (temperature, humidity, and the aggressiveness of the environment and so on) and to safety
the presence of the minimum required process load of the automation object for the definition and the settings of devices and means of automation, testing and commissioning of automation systems
under the actuation setpoints devices of automation equipment and systems specified in the working documentation or installed by the customer
the customer's documentation of completion of installation works
At the third stage, the work on integrated commissioning of automation systems, which will bring the settings of devices and means of automation, communication channels to values at which the automation system can be used in operation.
When this is carried out in the complex:
determination of compliance with the order of testing devices and items of alarm systems, protection and control algorithms working documentation identifying the reasons for the denial or "false" positives them to install the necessary values actuation of positional devices
determination of compliance throughput valves to the requirements of the process, the correctness of the testing circuit breakers
the determining flow characteristics of governing bodies and bringing them to the desired rate using the design configuration items
preparation for the inclusion and involvement of automation systems to ensure comprehensive testing of process equipment
the specification of static and dynamic characteristics of the object, adjust the settings of the systems, taking into account their mutual influence in the process
test and determine the suitability of automation systems to ensure the operation of equipment performance, consistent with the norms of mastering the design capacity in the initial period
analysis of automation systems in operation
the design of the production documentation.
The third stage is performed after the completion of construction works, their acceptance by the working Committee, in accordance with the requirements of the building regulations and the rules on the spot and in the presence of a stable process.
All switching modes of operation of technological equipment when determining the actual characteristics of the automation object should produce the customer. Enabling and disabling automation systems should be recorded in the operational log.
Commissioning of automation systems should be carried out in accordance with the requirements contained in the working documents, the instructions of the manufacturers of the devices and means of automation or in the sectoral rules, acceptance of the completed construction.
The results of the commissioning of the Protocol, in which shall be entered the assessment system, conclusions and recommendations. Implementation of recommendations for improvement of the automation systems is carried out by the customer.
Transmission automation systems in operation is performed in coordination with the customer as separately established systems, and fully automated installations, process equipment assemblies and workshops.
Upon delivery of automation systems in operation by separately established systems up act of commissioning of automation systems.
To the act shall be accompanied by the following documentation:
the list of setpoints devices, instruments and means of automation and values of the settings of the automatic control systems (regulation)
programs and testing protocols automation systems
schematic diagram of the working documentation automation with all the changes made and agreed with the customer in the production process of commissioning (one instance)
passports and instructions of manufacturers of automation equipment and systems, additional technical documentation received from the customer in the process of commissioning.
The completion and commissioning of the works is fixed by the act of acceptance of automation systems in operation in accordance with the project.
THE COMMISSIONING OF INDIVIDUAL AND CENTRAL HEAT POINTS
Commissioning ETC , as well as the transit center at Manas , as a rule, is reduced to the adjustment of the installed automatic control systems of the HCP. Automation not only supports the smooth operation of the system within the specified parameters, adjusts the parameters of the system, but also monitors regime system that allows you to avoid penalties from tabletpurchase organization. With the help of automatic control systems is carried out round-the-clock monitoring of calorific point - in software automatic control systems heat points (not only the ITP , but TSC ) is provided by the so-called emergency settings. In case of emergency automatics indicates that the system has problems, and the heat paragraph goes on standby mode.
When the adjustment ITP CHP starts heating system and determine its operating mode. Specialist commissioning ITP (TSC), sets the operation mode of the boiler and the system parameters. Next ITP (TSC) is running in the specified mode. When using ITP ordinary user can change a parameter such as the temperature in the room (particularly during seasonal cold snap to set a higher value, and when the warming - lower). However, you must remember that even the automatics may intermittently fail. Adjustment etc