Bizator  /  Adverts  /  equipment and materials  /  industrial equipment  /  construction methods, handling machinery

Installation for the production of cinder blocks high quality Jitomirskoy the region.

Offer type: salePublished: 28.02.2015
Price:4 000 UAH
Company:ASVgroup
Seller:Lyisenko Aleksandr Sergeevich
Phones:
Show phone
Write a message
Address:Ukraine, Zhytomyrs'ka Oblast', Zhytomyr

The duty cycle of the mechanism is as follows:
the batch in the mixer hard concrete (water / cement ratio of 0.5), the maximum cone without impurities (organic, clay, and others);
loading machine;
preliminary vibration of 0.5-1.5 seconds to fill the voids;
the stacked alignment of the mixture in the MARS trowel to the desired level, and if you are used Stikovica the mixture into the corners of forms;
the formation of the block when the vibrator within 20 to 60 seconds, depending on concrete quality, this is achieved experimentally in the process;
the vibrator is turned off when lifting the machine;
unit ready " ...next!
The finished blocks can be transported through the day.
To enable the machine to the network 220 with a grounded wire or through a special Transformer Security.
Time machine is running short (up to 2 minutes continuously).
The motor of the vibrator should not overheat.
Water (moisture) and the solution should not get on the on/off switch on the motor housing and the current-carrying wire.
After the operation, the machine must be cleaned, and wipe clean oil cloth surfaces.
The machine can operate trouble-free for a long time in the operating rules.