Bizator  /  Adverts  /  equipment and materials  /  industrial equipment  /  compressors, pumps, compressor equipment

valve CPC-150-2,5

Offer type: salePublished: 21.10.2019
Price:negotiated
Company:Torgovyij Dom 'KMZ'
Seller:Torgovyij Dom 'KMZ' Kristina Aleksandrovna
Phones:
Show phone
Write a message
Address:Mykolayivs'ka Oblast', Mykolayiv, Ukraine

When valve repair is:

1. To ensure no on the details of cracks, dents and other mechanical damage, worsening operation of the valve; 2. When assembling the valve to maintain cleanliness and accuracy the location of individual parts in the valve. 3. When setting the locking straps are not allowed the pinching plates and springs. In the assembled valve check freedom of movement of the plates and springs under the retaining strap.

* When polluted and wet environment, the valves shall be inspected every 500 hours of operation of the compressor.

The refurbished CTC valve (valve PKC) checked on tightness by the method described below. The criterion of tightness of the CPC after the repair shall be not less than given in table 1. The average time of operation of the plate valve until the first failure, at 700 -1000 rpm of the crankshaft of the compressor is 2000 hours.