Bizator  /  Adverts  /  equipment and materials  /  industrial equipment  /  construction methods, handling machinery

Disposable formwork for ventilated screed flooring and Foundation

Offer type: salePublished: 26.11.2019
Price:340 UAH
Company:Silamet
Seller:Silonov Sergej
Phones:
Show phone
Write a message
Address:Ukraine

Vented disposable formwork is a modular design for the Foundation of recycled plastic. It is used for the construction of a reinforced concrete raised floors with a height up to 300 cm, providing an easy, quick and economical filling of any construction with concrete.

This floating floor system is built faster and easier, with less weight and more economical than the traditional Foundation work.

Information on our website: https://www.silamet.com.ua/materialy/opalubka-dlya-fundamenta

1. easy solution to any problems with the content: regardless of the height to the structure is added only the weight of concrete coating having 95% resistance to moisture and vapor permeability.

2. Arco-dome form formwork reduces the required thickness of concrete cover as a result - saves the volume of construction materials gravel, concrete, fillers, and works in the use of heavy construction equipment.

3. unmatched logistical advantage: thanks to this design, the components can be folded into each other, providing a huge space efficient. At the height of the sample 100 cm, 1 truck with a disposable formwork equivalent to 50 trucks with alternative filler - concrete!

4. very high load capacity: when the height of the sample 100 cm, and only 5 cm of the upper layer, the permissible load capacity is 55 kN/m2 and has increased strength in compression up to 500 kg/m2, and the simultaneous casting of slab and beam Foundation creates a monolithic structure with high load bearing capacity and resistant to any seismic resistance.

5. the reduction of construction time: the construction work on the upper floors can continue without having to wait for fill on the bottom, because the filling can be performed at any time, which saves very valuable time of construction.

6. to create a blank space under the dome formwork which has a width of 59 cm between columns Ø125 mm. This means that any kind of electrical or mechanical plant can be passed through it before or after the construction of the formwork.

7. quick and easy installation: 100 m2/hour for fixed-height, 20 m2/HR for adjustable height and does not require skilled labour, which leads the reduction of requirements for manpower up to 80% compared with conventional systems of concreting.

8. any kind of top coating: epoxy paint, flooring, asphalt, concrete, etc. similarly, the divider wall can be mounted directly on the surface.