Bizator  /  Adverts  /  petrochemical production  /  chemical products

Meran, 80 V. G. 1kg

Offer type: salePublished: 29.12.2015
Price:13.5 $
Company:Inter-Agro S
Seller:Kotlyarov Sergej Nikolaevich
Phones:
Show phone
Write a message
Address:Ukraine, Kirovohrads'ka Oblast', Kirovohrad

Merpan

Kaftan, 800 g/kg

About the drug:

Contact fungicide with protective action with curative effect to protect the tree.

 

Advantages:

  • Antiresistance indispensable in the protection strategies against pathogens.
  • High efficacy against major diseases.
  • Can be used on all phases of development of culture.
  • Increases quality and improves storage of the fruit.
  • Not toxic and not dangerous to bees.
  • The perfect partner in mixtures with fungicides with systemic action.

 

APPLE

  • The consumption rate is 1.9 - 2.5 l/ha
  • Harmful object - Scab, gray mold fruit
  • Method and time of treatment: Spraying during vegetation at appearance of the first signs of one disease. Subsequent processing is carried out with an interval of 7-14 days
  • Maximum number of treatments - 3
  • The waiting period before harvest, days - 40
  • The waiting period before going into the field (mechanized/manual) - 3/7 days

SOY

  • The consumption rate is 2.0 - 2.5 l/ha
  • Harmful object Ascochyta blight, Fusarium
  • Method and time of treatment: Spraying during vegetation at appearance of the first signs of one disease. Subsequent processing is carried out with an interval of 7-14 days
  • Maximum number of treatments - 2
  • The waiting period before harvest, days - 20
  • The waiting period before going into the field (mechanized/manual) - 3/7 days

PEAS

  • The consumption rate is 2.0 - 2.5 l/ha
  • Harmful object Ascochyta blight, Fusarium
  • Method and time of treatment: Spraying during vegetation at appearance of the first signs of one disease. Subsequent processing is carried out with an interval of 7-14 days
  • Maximum number of treatments - 3
  • The waiting period before harvest, days - 20
  • The waiting period before going into the field (mechanized/manual) - 3/7 days