Bizator  /  Adverts  /  petrochemical production  /  chemical products

Prometrex 50,S. C., 5L

Offer type: salePublished: 29.12.2015
Price:10.7 $
Company:Inter-Agro S
Seller:Kotlyarov Sergej Nikolaevich
Phones:
Show phone
Write a message
Address:Ukraine, Kirovohrads'ka Oblast', Kirovohrad

About the drug:

Selective herbicide to control annual dicotyledonous and some cereal weeds in seeds of many field crops.

 

Advantages:
A recognized expert against a field of mustard and wild radish.
Has no limitation in crop rotation.
High selectivity of action.
Significantly reduces the negative impact of weeds in the early, most critical period in the development of cultivated plants.
Sunflower 

Consumption rate ― 3.0 l/ha

Harmful object Annual dicotyledonous and cereal weeds

Method and time of treatment ― Spraying soil before sowing, during sowing or before the emergence of culture

Maximum number of treatments ― 1

The waiting period before harvest, days ― Not regulated

The waiting period before going into the field (mechanized/manual) ― 3/15 days
Potatoes 

Consumption rate ― 3.0 l/ha

Harmful object Annual dicotyledonous and cereal weeds

Method and time of treatment ― Spraying soil before sprouting

Maximum number of treatments ― 1

The waiting period before harvest, days to 90

The waiting period before going into the field (mechanized/manual) ― 3/7 days
Soy 

Consumption rate ― a 2.0 ― 3.0 l/ha

Harmful object Annual dicotyledonous and cereal weeds

Method and time of treatment ― Spraying soil before sprouting

Maximum number of treatments ― 1

The waiting period before harvest, days ― Not regulated

The waiting period before going into the field (mechanized/manual) ― 3/ day
Carrots 

The consumption rate is 2.0 l/ha

Harmful object Annual dicotyledonous and cereal weeds

Method and time of treatment ― Spraying soil before seeding, before sprouting or in the phase of 1-2 true leaves of culture

Maximum number of treatments ― 1

The waiting period before harvest, the DIB ― 120

The waiting period before going into the field (mechanized/manual) ― 3/7 days