Bizator  /  Adverts  /  construction industry
Sort by: 
Show: 2040100
Tested remedies - signs of stress in Volgograd and Volzhsky
services
Pointers voltage above 1000 V are used in electrical systems above 1000 V to verify the presence or absence of voltage. When operating tests isolating the operative part and the measuring rod is subjected to
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Repair of apartments in Bucha
services
The team of qualified specialists will produce all kinds of finishing works. Stucco, plaster, paint, Wallpaper, screed, flooring, panels, MDF and PVC, drywall, tiling, installation of doors and Windows, installation
Ukraine, Kyiv Oblast'
Show phone
Testing of high voltage cables, transformers, switches in Volgograd and Volzhsky
services
Insulation test high voltage, you can ensure you have the required margin of safety isolation, lack of common defects that are not detected by other methods. Cable lines, transformers, circuit breakers are
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
High voltage testing of cables, power transformers, circuit breakers in Volgograd and Volzhsky
services
High voltage testing of cables, power transformers, high-voltage switches is carried out with application of high voltage to identify the area of electrical equipment insulation defects, if the pre-measurement is
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Measurement loop phase-neutral, phase-zero in Volgograd and Volzhsky
services
The purpose of the measurement loop resistance phase-zero is to determine compliance with the rated current of the protection devices and the wire size of the measured circuit. In electrical installations up
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Measurement of resistance of grounding in Volgograd and Volzhsky
services
After completion of the installation of the ground loop and in the process of operation, it is necessary to check the quality of work. Proof of the correct execution of the wiring circuit grounding is the
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Measurement of insulation resistance of electrical equipment in Volgograd and Volzhsky
services
Insulation resistance DC is a key indicator of the state of isolation, and its measurement is an integral part of the testing of all types of electrical equipment and electrical circuits. Standards inspections and
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Check for continuity of grounding and protective conductors in Volgograd and Volzhsky
services
All protective conductors (including ground and the conductors of the system equipotential bonding) should not have breakages and poor contacts in the field of their accession to the open and third conductive parts.
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Inspection and testing of measuring complex in Volgograd and Volzhsky
services
Check proper connection of the meter and current transformers, removing the volt-ampere characteristics, the transformation ratio of the current transformers. Test VPP NWAM performs inspection and testing of
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Testing of the protection dielectric gloves in Volgograd and Volzhsky
services
Dielectric gloves are used to protect personnel against electric shocks. They are used as an additional means of protection in electrical installations above 1000 V, and the electrical voltage up to 1000 V
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Tests of security - locksmith tool in Volgograd and Volzhsky
services
Fitter tools with insulated handles designed to work in the electrical voltage up to 1000 V and can be used as the primary means of protection when working under stress. In case of breakdown, flashover or
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Testing of the protection dielectric bots in Volgograd and Volzhsky
services
Dielectric overshoes and bots as an additional protective equipment are used in the operations to be performed using the basic protective equipment. While bots can be used both in closed and open any electrical
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Check the action of protective devices (RCD) in Volgograd and Volzhsky
services
The purpose of the RCD is to protect against electric shock man, in contact with parts of the electrical installation under voltage or electrical faults, as well as for the prevention of fires related to
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
The adjustment devices of relay protection and automatics and in Volgograd and Volzhsky
services
According to regulations, pteep, CH.1.3; Sep 7th ed. CH.1.8 before commissioning of electrical installations must be carried out acceptance tests and commissioning tests of individual systems installations. The
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Testing of vacuum, gas and oil circuit breakers in Volgograd and Volzhsky
services
In accordance with the requirements of PUE commissioned air switches are tested in the following amounts: 1. Measurement of insulation resistance. a) support insulators can be tted with cameras and separators and
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
The adjustment devices of the automation systems in Volgograd and Volzhsky
services
When the adjustment of automation systems on the existing technological equipment necessary to provide the required project precision measurements of parameters of technological process. The accuracy of
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Erection of distribution switchboards in Volgograd and Volzhsky
services
When creating a power supply networks of any object important point is the installation of switchboards, various switchgear and control cabinets. These devices are primarily in public and industrial buildings, and
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Laying of cables, installation of cable lines
services
First, inside buildings and structures establish support structures for cables; then lay the cables and connect them to the leads of electrical equipment (work lead after the completion of construction and
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Installation of power transformers
services
Installation of power transformers is carried out by specialised teams under the guidance of highly skilled foremen and craftsmen who have experience in installation of transformers. Volgograd Commissioning Firm
Russian Federation, Volgogradskaya Oblast', Volzhskiy
Show phone
Polyethylene pipe PE (plastic) HDPE pipe pressure PE-80 and PE-100
sale
Polyethylene pipe PE (plastic) HDPE pipe pressure PE-80 and PE-100 from the manufacturer. Polyethylene pipe technical, pipe for technical irrigation pipe for cable. Can be manufactured to order. Small and
Ukraine, Kharkivs'ka Oblast', Kharkiv
Show phone